Please ensure Javascript is enabled for purposes of website accessibility

Technology Installation & Rollouts

Your rollout, installed. Every room, every site.

Our own IT installers and movers mount, install, and test new technology across hundreds of rooms and multiple sites — with a dedicated project manager coordinating every activation — so your IT team can stay focused on the technology instead of the labor.

What happens next

01  A project manager replies within 1 business day

02  Scoping call on devices, sites, and rollout schedule

03  Site-by-site crew plan and quote

1,985

Rooms in our largest rollout to date

11

Hospitals in a single program

12

Hub markets with our own installers

1

Project manager on every activation call

Crews Sized to Each Site

A plan for every building, not one crew for all of them.

A 30-room hospital and a 350-room tower need different crews. We plan each site separately, from a two-person team to ten installers and movers with their own trucks and transport, and run sites in parallel when your schedule needs it.

Rollout Plan · Sample

4 sites · 860 rooms

Site A · Main tower

Rooms: 360
Crew: 5 installers + 5 movers
Status: Complete

Site B · Hospital

Rooms: 285
Crew: 4 installers + 4 movers
Status: Testing

Site C · Hospital

Rooms: 180
Crew: 3 installers + 3 movers
Status: Installing

Site D · Clinic

Rooms: 35
Crew: 1 installer + 1 mover
Status: Scheduled

Illustrative example. Crew sizes and sequence are set per project.

IT Installation Services

What our installers handle.

The physical side of a technology rollout — receiving, mounting, installing, and testing — done the same way in every room, so your team or vendor can activate without rework.

TV & display mounting

Wall-mounted TVs and displays in every room, secured and positioned to your standard.

Cameras & in-room devices

Cameras, speakers, and other room devices installed and connected for your team to activate.

Workstations & IT hardware

Computers, monitors, and peripherals unboxed, assembled, and placed at every desk or station.

Receiving & staging

Shipments received, inventoried, and staged by site and floor so crews never wait on equipment.

Testing before go-live

Devices tested at each site before rooms are handed over for network-wide activation.

Cleanup, patch & paint

Packaging and debris hauled away, and wall repairs patched and painted where needed.

When to Bring Us In

Your IT team bought the technology. Not the labor.

Most rollouts don’t stall on the technology. They stall because the people who should be configuring and activating it are busy carrying boxes and mounting brackets.

Who Does What

We take the labor and the logistics.

Your team keeps control of the technology. Our project manager joins your activation calls and schedules crews around them.

Johnson Commercial Solutions

  • IT installers and movers, sized per site
  • Dedicated project manager on every activation call
  • Receiving, staging, and delivery to each room
  • Mounting, installation, and testing
  • Debris removal and patch and paint

Your IT team

  • Device configuration and network access
  • Activation and go-live sign-off
  • Site priorities and rollout sequence
  • Facility access and scheduling rules

Your technology vendor

  • Equipment supply and shipping
  • Platform setup and software
  • Installation standards and specs
  • Warranty and support

Case Study · UCHealth

“We were doing the labor ourselves and it became overwhelming. The project came to a screeching stop. They took over all the installing and testing and now we’ve made huge progress in our project.”

David Coffman · Senior Project Manager, UCHealth IT

1,985

Patient rooms in scope

11

Hospitals

Where We Work

Local crews in 12 hub markets.

Our IT installers are JCS employees, available in every hub market. Rollouts across multiple regions run under one project manager.

Often Paired With

How Do Professionals Keep Data Servers Safe In Transit During Relocation?

IT & Data Center Relocation →

Server rooms and IT equipment moved on a cutover plan.

How Office Relocation Professionals Make Corporate Relocation in Dallas, TX, a Breeze

Move Management →

One project manager across every vendor and site.

Furniture Installation →

Workstations and furniture installed alongside your technology.

How Biotech Labs Can Improve Their Supply Chain With Logistics Partners in San Diego, CA

Commercial Storage →

Secure staging for equipment before it goes to each site.

FAQ

Technology installation questions

Our IT installers are Johnson Commercial Solutions employees, working alongside our own movers and led by our own project managers.

We handle the physical installation and testing. Your IT team or technology vendor configures and activates the devices, and our project manager joins those activation calls so crews are scheduled around them.

Site by site, based on room count and schedule. Smaller sites may need one installer and one mover; large towers can need ten-person crews with dedicated trucks and transport vans.

Yes. We schedule around access rules, occupied rooms, and your facility procedures, and work room by room so operations continue.

Yes. We receive shipments, inventory them, and stage equipment by site and floor, with secure commercial storage available between deliveries.

Yes. Our installers work in all 12 hub markets, and multi-region rollouts run under a single project manager.

Why Infrastructure Storage Planning is Best Solved Before The Project Starts

Is your rollout waiting on labor?

Tell us what you’re installing and where. We’ll send back a site-by-site crew plan.