IT & Data Center Relocation

Move the servers. Keep the business online.

Server rooms, network gear, and workstation IT relocated on a written cutover plan — sequenced around your maintenance window and coordinated with your IT team, MSP, or OEM vendors from first walkthrough to final power-on.

What happens next

01  A project manager replies within 1 business day

02  Walkthrough of both sites, in person or virtual

03  Written cutover plan and quote

Sample Cutover Plan

What a weekend server move looks like.

Most server moves happen between Friday evening and Monday morning. Every step is scheduled in advance, and every handoff to your IT team is named in the plan.

Cutover Plan · Sample

Fri 18:00 → Mon 06:00

FRI 18:00

Shutdown & backup sign-off
Your IT team confirms systems are down and backed up.

FRI 19:00

De-rack, label & pack
Every asset tagged to its source and destination position.

SAT 08:00

Secure transport
Loaded by rack and priority; chain of custody documented.

SAT 14:00

Place & re-rack
Installed to your new rack elevations and floor plan.

SUN

Power-on & validation
Your team tests; our crew stays on call for adjustments.

Every plan is built per project. Windows and sequence are set with your team during discovery.

100+

Years moving businesses

12

Hub markets with our own crews

350+

Markets via the Office Moving Alliance

1

Point of contact, walkthrough to power-on

What We Move

From a single server closet to a full data hall.

We handle the physical side of the move — packing, transport, placement, and storage — while coordinating every step with whoever owns the technical side.

Server rooms & data halls

Racks, servers, storage arrays, and UPS units — de-racked, packed, and placed to your new elevations.

Network & telecom equipment

Switches, firewalls, patch panels, and telecom gear moved in sequence with your cutover plan.

Workstation IT for office moves

Desktops, monitors, docks, and peripherals tagged by user and set up at the right desk on day one.

Healthcare & lab technology

Clinical IT and sensitive electronics handled around access rules, schedules, and facility protocols.

AV & conference room tech

Displays, conferencing systems, and AV carts packed, moved, and placed room by room.

Retired & surplus equipment

Inventory, staging, and disposition planning for equipment that isn’t making the move.

How It Works

Five phases. One plan everyone signs off on.

IT moves fail in the handoffs — between the movers, the IT team, the building, and the vendors.
The plan exists to close those gaps before move weekend.

01

Discovery

Walkthroughs of both sites, a full equipment inventory, and a conversation with whoever owns the technical cutover.

02

Move plan

A written plan covering sequence, labeling, crew assignments, building access, and the downtime window.

03

Pack & secure

Equipment packed and crated to protect it in transit, tagged to its source and destination position.

04

Transport & place

Moved in priority order and installed to your rack elevations and floor plan.

05

Validate & close out

Your team tests and signs off while our crew stays available; we document the move and clear the old site.

Who Does What

Clear lines between our crew and your IT team.

Johnson Commercial Solutions

  • Site walkthroughs, inventory, and asset labeling
  • Written move plan and cutover schedule
  • Packing, crating, and secure transport
  • Placement to your rack elevations and floor plan
  • Building coordination: docks, elevators, after-hours access
  • Interim storage and decommissioning of retired equipment

Your IT team, MSP, or OEM

  • Backups, shutdown, and system validation
  • Network configuration and cutover logic
  • OEM service, warranty, and calibration requirements
  • Final power-on and acceptance testing

We schedule our crews around these steps so nothing sits idle and nothing gets moved before it's ready.

How Relocation Professionals Can Move Laboratories Safely

Featured Project · Healthcare

Server equipment delivery and placement for UC Health

The first phase of a multi-project partnership: receiving, uncrating, and placing Micron server equipment inside an active healthcare environment, where access windows and infection-control rules shape every step.

Where We Work

Local crews in 12 hub markets.

Centennial and Indianapolis specialize in IT and server relocation. Every hub handles IT as part of office moves, and multi-site programs run through one contact.

Often Paired With

Office Location at Johnson Commercial Solutions

Office Relocation →

The full office move your IT relocation sits inside.

How Office Liquidation an Use White-Glove Logistics Help

Office Decommissioning →

Clearing and returning the old space once the move is done.

Commercial Storage at Johnson Commercial Solutions

Commercial Storage →

Secure interim storage between sites, with scheduled releases.

How Office Relocation Professionals Make Corporate Relocation in Dallas, TX, a Breeze

Move Management →

One plan and one contact across every vendor, with PRISM visibility.

FAQ

IT relocation questions

We coordinate disconnect and reconnect sequencing with your internal IT team, MSP, or OEM vendors and build our crew schedule around it.

Yes. Most IT moves are scheduled around a planned downtime window — typically evenings or weekends — so your team loses as little production time as possible.

Equipment is packed and crated by type, tagged to its source and destination, and loaded in priority order with documented chain of custody.

Yes. We offer secure short- and long-term commercial storage with scheduled releases, so equipment arrives when the new space is ready.

We inventory and stage retired equipment and plan its disposition as part of office decommissioning, so the old space is cleared on schedule.

Yes. Our 12 hub markets and the Office Moving Alliance network of 350+ markets let us run multi-site programs with one point of contact.

How Do Professionals Keep Data Servers Safe In Transit During Relocation?

Planning a server or IT move?

Tell us your equipment, sites, and downtime window. We’ll scope a cutover plan built around them.